What the Third-Party Inspector Actually Looks At

The Short Version

  • The owner hires the special inspector, not the contractor.
  • They check your work before, during, and after welding and bolting.
  • Good paperwork is what makes inspection day go smooth.

Welding

Before. During. After.

Before

Welding

WPS available, welders qualified, material identified, joint fit-up and prep, preheat if required.

During

Welding

WPS being followed, interpass temperature, cleaning between passes, approved consumables.

After

Welding

Weld size, length, and profile. No cracks or undercut beyond limits. Welder ID on the weld record.

Bolting

Bolts get checked too.

  • Bolts, nuts, and washers match the drawings, with certs
  • Fasteners stored dry and protected
  • Connection surfaces prepped the way the drawings call for
  • Snug-tight or pretensioned, using the method the job requires

Inspection Day

How to make it easy.

1
Know the hold points

Go over the inspection plan with the inspector before you start. Don't weld past a hold point without a sign-off.

2
Have the paperwork ready

Drawings, WPSs, welder quals, MTRs, and bolt certs, organized by job.

3
Do your own QC first

You check it before they do. Their job is quality assurance: confirming your quality control works.

4
Fix it and write it down

If they find something, tag it, write a nonconformance report, fix it, and get it re-inspected.

Get the free rulebooks.AISC 360 and the Code of Standard Practice are free downloads.

General information, not engineering or legal advice. Always read the project specs and check with your local building department.