The Short Version
- The owner hires the special inspector, not the contractor.
- They check your work before, during, and after welding and bolting.
- Good paperwork is what makes inspection day go smooth.
Welding
Before. During. After.
Welding
WPS available, welders qualified, material identified, joint fit-up and prep, preheat if required.
Welding
WPS being followed, interpass temperature, cleaning between passes, approved consumables.
Welding
Weld size, length, and profile. No cracks or undercut beyond limits. Welder ID on the weld record.
Bolting
Bolts get checked too.
- Bolts, nuts, and washers match the drawings, with certs
- Fasteners stored dry and protected
- Connection surfaces prepped the way the drawings call for
- Snug-tight or pretensioned, using the method the job requires
Inspection Day
How to make it easy.
Go over the inspection plan with the inspector before you start. Don't weld past a hold point without a sign-off.
Drawings, WPSs, welder quals, MTRs, and bolt certs, organized by job.
You check it before they do. Their job is quality assurance: confirming your quality control works.
If they find something, tag it, write a nonconformance report, fix it, and get it re-inspected.
Get the free rulebooks.AISC 360 and the Code of Standard Practice are free downloads.
General information, not engineering or legal advice. Always read the project specs and check with your local building department.