Free Resources
AISC Standards.
What GCs Mean by "AISC."
Once you start getting GC bid invites, you'll see it in the specs: fabricator shall be AISC certified, or AISC compliant. Here's what that means, and the free rulebooks you need.
Free Downloads
The Rulebooks Are Free.
AISC gives away its current standards as free PDF downloads.
The big printed Steel Construction Manual costs money. The rulebook and the code of standard practice inside it don't. Download them straight from AISC so you always have the current edition.
Specification for Structural Steel Buildings
The rulebook. Design, fabrication, and erection requirements, including Chapter N: quality control and quality assurance.
Free Download at AISCCode of Standard Practice
Who's responsible for what between the owner, the GC, the engineer, the detailer, the fabricator, and the erector.
Free Download at AISCSeismic Provisions
Extra requirements for steel in seismic systems. You'll see it on jobs in seismic areas.
Free Download at AISCStandard for Certification Programs
What AISC looks for if you ever go for full certification.
Free Download at AISCRead the Spec Carefully
Compliant vs. Certified.
AISC Compliant
Not an official status
- You fabricate to AISC 360 and the Code of Standard Practice (AISC 303)
- You run your own written quality control program (AISC 360, Chapter N)
- Written procedures, qualified welders, and a QC inspector
- The owner's third-party inspector checks your work
AISC Certified
A paid certification with audits
- AISC audits your shop and your quality system
- Some jobs require it outright. "Compliant" won't qualify you there
- Owner's QA inspections can be waived when the building official accepts it, but not NDT
- It's not an automatic pass. The building official still approves the fabricator
Special Inspections
How the Third-Party Inspector Works.
Under the building code, the owner or the owner's agent hires the special inspector, not the contractor.
Special inspections are required at the fabrication shop unless the building official has approved the fabricator. Approval is based on your written procedures, your quality control manual, and periodic audits.
Your shop is responsible for quality control. The owner's inspector does quality assurance and checks that your QC is working.
Written procedures, qualified welders, material traceability, and clean paperwork are what get you through inspection without delays.
Most commercial jobs follow this, but every job is different. Read the project specs and check with the local building department. Specs can require full certification or shift inspection costs.
Standards from the American Institute of Steel Construction (aisc.org). Special inspection requirements from the International Building Code, Chapter 17, as adopted and amended by your state or local jurisdiction. This is general information, not engineering or legal advice.

