The Short Version
- This one line is the whole idea behind AISC quality control.
- Your manual says it. Your shop does it. Your paperwork proves it.
- If it's not written down, the inspector can't count it.
The Whole Idea
Three parts. That's it.
Say what you do.
The Manual
Write down how your shop handles material, welding, inspection, and problems. Plain words. Your real process.
Do what you say.
The Shop
Follow it every job. If the shop does it differently, change the manual or change the shop.
Prove it.
The Paperwork
Initials, signatures, logs, and records that show each step happened.
Real Examples
What it looks like on the floor.
| Step | Do | Prove |
|---|---|---|
| Receiving | Check material against the PO: size, grade, quantity, condition. | Initial and date each line on the PO. File the MTR. |
| Cutting | Transfer the heat number before cutting a piece off. | Heat number marked on every cut piece. |
| Welding | Only qualified welders, working to a WPS. | Welder ID on the weld
Previous
Previous
A Quality Manual Isn’t Scary. You’re Already Doing Most of It.Next
Next
What “AISC Compliant” Means in a Bid Invite |

